Skip to content
North York Plumbing ServicesNorth YorkPlumbing Services

Phone line open 7 days
Homes and businesses, Highway 401 to Steeles

Call the desk(365) 517-5705
Laying pipes and wiring during repairs in kitchen room with white walls and big window

Service · Pipes laid during renovation.

Specialty: renovations

Basement Bathroom Rough-In Across North York

A basement bathroom is mostly decided before the drywall goes up. We lay out the drains, vents and supplies to fit your floor plan and the depth of the existing sewer line.

  • Cause found and explained before any work starts
  • On the van: Concrete saw, levels, PVC fittings, test caps
  • Finished with: Water test held on the open trench
  • Booked by phone anywhere in North York

Speak to the desk(365) 517-5705

Call now
  • Licensed and insured: details confirmed on the call
  • Plan explained before work starts
  • Residential and commercial

What basement bathroom rough-in involves

A rough-in is the hidden part: drain lines under the slab, vent pipes in the walls, and water lines stubbed out with caps where the fixtures will go. In most houses the toilet, shower and sink drains must tie into the building drain below the basement floor, which means cutting a trench in the concrete.

ItemWhat we check
Depth of the main drainWhether gravity drainage is possible
VentingA route into an existing stack, or a new vent
Fixture positionsToilet centre at 12 inches from the finished wall is common
BackflowA backwater valve protects new low fixtures

If the main drain sits too high, an ejector pump or upflush unit pumps waste up to the line instead.

Why North York houses need it

Newtonbrook, Willowdale and many other areas have houses with roomy basements and one bathroom upstairs. Adding a second one below grade is one of the most common renovations we see. Some houses have a rough-in from the builder, capped pipes poking out of the slab, but those were often set decades ago and may not match today's layout or codes.

Plumber's tip: Before you design the room, find out where your existing stack and main cleanout are. Putting the toilet close to them saves trenching and money.

How we write up the job

We draw the layout on the order: fixture positions, pipe sizes, slope, vent route and connection point. The permit number goes on the sheet. Rough-in plumbing must be inspected before the trench is filled and the walls closed, and we schedule that inspection. See our permit leaflet for how the process works.

Signs you should call

  • You are planning to finish the basement this year.
  • There are capped pipes in your floor from an old rough-in.
  • You want a laundry and a bathroom side by side.
  • You need a second unit and have to meet separate requirements.

A gas line for a dryer or a kitchenette drain can be planned at the same time.

Costs and what affects them

Trench length, concrete thickness, depth of the sewer, and whether a pump system is needed are the main variables. Permits and inspection are part of the work. We list the stages and the price of each.

Job at a glance

What we bring and how we check it
CategoryBasement
ToolsConcrete saw, levels, PVC fittings, test caps
Final testWater test held on the open trench

Tell-tale signs

  • Finishing a basement with no bathroom
  • Sewer line is deep enough for gravity
  • Need for an ejector pit if it isn't

Steps on the job

  1. Confirm sewer depth and slope available
  2. Saw-cut the slab and trench for drains
  3. Lay pipe with correct fall and vent tie-ins
  4. Water test before the slab is poured back

Your questions on this one

Will a basement bathroom need a permit?

It will. Plumbing below the floor is inspected before it is covered.

How long does a rough-in take?

Often a few days, including concrete cutting and the inspection.

Call now · (365) 517-5705